Neutral point clamped converter control system and control method and compensation unit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9083261
APP PUB NO 20130128632A1
SERIAL NO

13682996

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A control system includes a fundamental control unit, first and second compensation control units, a switch control unit, and a switch implementation unit. The fundamental control unit generates fundamental commands to implement fundamental power conversion operation for a converter. The first compensation control unit generates a first compensation signal for injection into the fundamental command to balance neutral point voltage when the converter is in operation in a first state. The second compensation control unit generates a second compensation signal for injection into the fundamental command to balance neutral point voltage when the converter is in operation in a second state. The switch control unit detects first and second states of the converter and provides first and second switch signals respectively. The switch implementation unit switches the fundamental control unit to communicate with the first and second compensation control units according to the first and second switch signals respectively.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GE INFRASTRUCTURE TECHNOLOGY LLC300 GARLINGTON ROAD GREENVILLE SC 29615

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Klodowski, Anthony Michael Hardy, US 45 661
Liu, Yunfeng Shanghai, CN 83 464
Luo, Ling Shanghai, CN 16 82
Seymour, Robert Allen Roanoke, US 15 155
Wagoner, Robert Gregory Roanoke, US 164 1463
Yang, Wenqiang Shanghai, CN 19 240

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 14, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00