Construction machine having hydraulic circuit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9181677
APP PUB NO 20130129459A1
SERIAL NO

13813171

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A construction machine includes a hydraulic actuator circuit including: a first circuit connected to one of travel motors and a boom cylinder; a second circuit connected to the other travel motor and arm cylinder; and a third circuit connected to a slewing motor; control valves for hydraulic actuators; and a merging valve having a first position for unloading hydraulic fluid discharged from a third pump upon no operation except for two travel motors; a second position for merging the hydraulic fluid into the first and second circuits upon a simultaneous operation of the travel motors and an operation of at least one remaining hydraulic actuator except for a boom raising operation; and a third position for merging the hydraulic fluid into the first circuit while blocking it from the second circuit upon the boom raising operation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOBELCO CONSTRUCTION MACHINERY CO LTD2-1 ITSUKAICHIKOU 2-CHOME SAEKI-KU HIROSHIMA-SHI HIROSHIMA 7315161 ?7315161

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Oguma, Shota Hiroshima, JP 4 15
Saotome, Yoshimi Hiroshima, JP 10 124

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 10, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00