Method of manufacturing a glass roll

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9656901
SERIAL NO

13724353

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of manufacturing a glass roll, includes: a forming step (S1) of forming, while conveying a glass film, the glass film by a downdraw method; a temporary rolling step (S3) of rolling the glass film while superposing a protective film on the glass film at a downstream end of a path of the conveying in the forming step (S1), to thereby manufacture a source glass roll; and a main rolling step (S4) of unrolling, while conveying the glass film to a downstream side, the glass film from the source glass roll, and then rerolling the glass film while superposing a protective film on the glass film at a downstream end of a path of the conveying, to thereby manufacture a glass roll. Higher tension in a rolling direction is applied to the glass film in the main rolling step (S4) than in the temporary rolling step (S3).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON ELECTRIC GLASS CO LTD7-1 SEIRAN 2-CHOME OTSU-SHI SHIGA 5208639 ?5208639

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Eta, Michiharu Shiga, JP 31 622
Hasegawa, Yoshinori Shiga, JP 52 388
Mitsugi, Kaoru Shiga, JP 18 161
Mori, Hiroki Shiga, JP 338 3426
Mori, Koichi Shiga, JP 116 899
Teranishi, Yasuo Shiga, JP 28 488
Umemura, Hiromichi Shiga, JP 4 19

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 23, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00