Network system and method of controlling network system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9256214
APP PUB NO 20130131876A1
SERIAL NO

13511584

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided are a network system and a method of controlling the same. The network system includes an energy supply part including a plurality of power supply sources, an energy metering part communicating with the plurality of power supply sources, the energy metering measuring energy supplied from the plurality of power supply sources, an energy management part receiving energy-related information supplied from the energy supply part, and an energy consumption part consuming power supplied from the energy supply part, the energy consumption part being operable and controllable by the energy management part. At least one power supply source of the plurality of power supply sources is selected according to an order of priority of a power supply, based on energy information related to the plurality of power supply sources. Thus, the power supply source having minimum costs is selected to efficiently manage energy within an intellectual power supply network.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LG ELECTRONICS INC128 YEOUI-DAERO YEONGDEUNGPO-GU SEOUL 07336

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Daewoong Seoul, KR 101 383
Kim, Yanghwan Seoul, KR 60 693
Lee, Hoonbong Seoul, KR 55 451
Lee, Koonseok Seoul, KR 44 382

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 9, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00