System and method for determining potential power of inverters during curtailment mode

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8793028
SERIAL NO

13300898

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power inverter system includes a plurality of power inverters such as solar inverters receiving power from at least one energy source. Each power inverter includes algorithmic maximum peak power tracking (MPPT) software or integrated MPPT firmware to calculate its own potential real power. A controller is in electrical communication with selected power inverters that are operating in curtailed modes of operation and commands each selected power inverter to shift its power production duties and to perform MPPT sweeps. Each selected power inverter then calculates its own potential real power capability in response to corresponding MPPT sweep data. The potential real power capability information is received by the controller that transmits the information to a power utility allowing the power utility to more efficiently utilize real and reactive power available by the plurality of power inverters

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GE GRID SOLUTIONS LLC4200 WILDWOOD PARKWAY ATLANTA GA 30339-8402

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jain, Palak Las Cruces, US 7 15
O'Brien, Kathleen Ann Niskayuna, US 32 847
Schelenz, Owen Jannis Schenectady, US 11 119

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 29, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00