Magnetic tunnel junction (MTJ) and methods, and magnetic random access memory (MRAM) employing same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8889431
APP PUB NO 20130134533A1
SERIAL NO

13683783

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Magnetic tunnel junctions (MTJs) and methods of forming same are disclosed. A pinned layer is disposed in the MTJ such that a free layer of the MTJ can couple to a drain of an access transistor when provided in a magnetic random access memory (MRAM) bitcell. This structure alters the write current flow direction to align the write current characteristics of the MTJ with write current supply capability of an MRAM bitcell employing the MTJ. As a result, more write current can be provided to switch the MTJ from a parallel (P) to anti-parallel (AP) state. An anti-ferromagnetic material (AFM) layer is provided on the pinned layer to fix pinned layer magnetization. To provide enough area for depositing the AFM layer to secure pinned layer magnetization, a pinned layer having a pinned layer surface area greater than a free layer surface area of the free layer is provided.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
QUALCOMM INCORPORATED5775 MOREHOUSE DRIVE SAN DIEGO CA 92121

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kang, Seung H San Diego, US 152 3944
Li, Xia San Diego, US 444 4642
Nowak, Matthew San Diego, US 34 542
Zhu, Xiaochun San Diego, US 166 4448

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 18, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00