Control strategy for providing regenerative electrical power to trolley line in trolley capable mining truck

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8505464
APP PUB NO 20130140121A1
SERIAL NO

13308973

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A trolley capable mining truck includes a pantograph supported on a machine frame for electrically connecting the truck with an overhead trolley line. A power system includes an onboard electrical power source providing electrical power to electric drive propulsion motors along a first electrical path in a first configuration of the power system. The pantograph provides electrical power from the overhead trolley line to the electric drive propulsion motors along a second electrical path, which includes a transient damping reactor, in a second configuration of the power system. The power system also includes a third configuration in which, during a braking mode of the trolley capable mining truck, the electric drive propulsion motors provide regenerative electrical power to the overhead trolley line through the pantograph along a third electrical path including a regenerative power converter, wherein the regenerative power converter includes the transient damping reactor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CATERPILLAR INCINTELLECTUAL PROPERTY DEPARTMENT 100 NE ADAMS STREET PEORIA IL 61629

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bailey, Bradley S Peoria, US 4 39
Hendrickson, Matthew L Dunlap, US 3 21
Huber, Brian Carpentersville, US 28 142
Ruth, Eric J Peoria, US 12 124

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 13, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00