Bus bar, method of manufacturing the same, and bus bar and connector

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9011167
APP PUB NO 20130143426A1
SERIAL NO

13814441

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A busbar of the present invention increases yield per metal material in comparison to plate-shaped bus bars, enables provision of protrusions on a member located inside relative to a conductor, and enables formation of the busbar in a bent shape. The busbar of the present invention is provided with a busbar insulator (22), a busbar conductor (23), a busbar insulator (24), a busbar conductor (25), and a busbar insulator (26) formed outside of a busbar center conductor (21). These conductors and insulators are arranged alternately from the inner side towards the outer side in a radial direction (R) that intersects at right angles with the axial direction (A) of the bus bar. The busbar conductors (23, 25) are provided with openings (23o, 25o) along the whole length in the axial direction (A) thereof.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KABUSHIKI KAISHA KOBE SEIKO SHO (KOBE STEEL LTD )HYOGO 651-8585

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujiura, Takayasu Kobe, JP 22 130
Fujiwara, Naoya Kobe, JP 31 174
Hashimoto, Hiroshi Kobe, JP 452 4032
Inoue, Koji Kobe, JP 150 1559
Kikuchi, Naoki Kobe, JP 125 1526
Sugimoto, Akio Kobe, JP 37 346

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 21, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00