Power quality monitoring apparatus for railway power system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9448263
APP PUB NO 20130166232A1
SERIAL NO

13419709

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power quality monitoring apparatus is developed for a railway power system. The apparatus is calculating the energy flow and the power consumption and recording the by using the voltage and current sensors at AC and DC power source in the various industrial fields. The voltage and current phases are detected for the AC power. The direction of current is detected to calculate the power consumption for the DC power. Then, the detected data is analyzed. It is possible to monitor the variation of the voltages and current values of the railway vehicle in real time. It is possible to display the variations of the vehicle loads, the AC power output, the voltage and current value fluctuations, the power consumption and power flows in a form of the graphic or text format. Thereby, it is possible to easily understand the overall status of the overhead line's environment.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Assignment data not available. Check PTO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Tae-Suk Cheongju-Si, KR 3 20
Kwon, Kyoung-Min Jeungpyeong-Gun, KR 3 20
Lee, Eun-Kyu Cheongju-Si, KR 27 130
Pyo, Se-Wan Namyangju-Si, KR 1 5
Son, Kyoung-Min Cheongju-Si, KR 1 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 20, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 20, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00