Systems and methods for smart charging techniques, value and guarantee

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10843580
APP PUB NO 20130184886A1
SERIAL NO

13731320

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system and methods that enables smart charging for electric resources. A charging behavior guarantee may comprise a guaranteed charging schedule that matches a regular charging schedule of an electric resource and provides power flow flexibility. A smart charging method may also include periodically updated schedules and may manage electric resources via a smart charging benefit analysis. A smart charging method may manage the charging behavior of the electric resources on a grid based on the smart charging benefit. Further, a smart charging method may manage electric resources via a smart charging benefit analysis and smart charging customer guarantees. A smart charging method also may include schedules with overrides, and may involve a method for local load management in the presence of uncontrolled loads. A smart charging method for managing electric resources may also provide direct control over prices-to-devices enabled devices.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GRIDPOINT INC11911 FREEDOM DRIVE SUITE 850 RESTON VA 20190

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bridges, Seth W Seattle, US 34 4451
Pollack, Seth B Seattle, US 41 4912

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 24, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 24, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00