CONSOLIDATION

Number of patents in Portfolio can not be more than 2000

United States of America Patent

APP PUB NO 20130233623A1
SERIAL NO

13885350

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of strengthening subterranean formation by drilling and completing a wellbore penetrating at least one unconsolidated or weakly consolidated formation, the method comprising: (a) drilling at least one interval of the wellbore that penetrates the unconsolidated or weakly consolidated formation using a drilling mud comprising a base fluid comprising an aqueous phase containing up to 25% weight by volume (% w/v) of a water soluble silicate, wherein the drilling mud has an acid-soluble particulate bridging solid suspended therein that is formed from a salt of a multivalent cation, wherein the salt of the multivalent cation is capable of providing dissolved multivalent cations when in the presence of an acid; (b) subsequently introducing a breaker fluid containing an acid and/or an acid precursor into the wellbore; (c) allowing the breaker fluid to soak in the interval that penetrates the unconsolidated or weakly consolidated formation for a predetermined period and strengthening formation by reacting with silicate now present in formation; and (d) removing the breaker fluid.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BP EXPLORATION OPERATING COMPANY LIMITEDSUNBURY-ON-THAMES MIDDLESEX TW16 7BP

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aston, Mark Shelton Middlesex, GB 16 203
Aytkhozhina, Dana Middlesex, GB 3 22

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation