CONSOLIDATION

Number of patents in Portfolio can not be more than 2000

United States of America Patent

APP PUB NO 20130233623A1
SERIAL NO

13885350

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of strengthening subterranean formation by drilling and completing a wellbore penetrating at least one unconsolidated or weakly consolidated formation, the method comprising: (a) drilling at least one interval of the wellbore that penetrates the unconsolidated or weakly consolidated formation using a drilling mud comprising a base fluid comprising an aqueous phase containing up to 25% weight by volume (% w/v) of a water soluble silicate, wherein the drilling mud has an acid-soluble particulate bridging solid suspended therein that is formed from a salt of a multivalent cation, wherein the salt of the multivalent cation is capable of providing dissolved multivalent cations when in the presence of an acid; (b) subsequently introducing a breaker fluid containing an acid and/or an acid precursor into the wellbore; (c) allowing the breaker fluid to soak in the interval that penetrates the unconsolidated or weakly consolidated formation for a predetermined period and strengthening formation by reacting with silicate now present in formation; and (d) removing the breaker fluid.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BP EXPLORATION OPERATING COMPANY LIMITEDCHERTSEY ROAD SUNBURY ON THAMES MIDDLESEX TW16 7BP

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aston, Mark Shelton Middlesex, GB 16 203
Aytkhozhina, Dana Middlesex, GB 3 22

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation