Gasification melting facility

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10047953
APP PUB NO 20130319300A1
SERIAL NO

14000315

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This gasification melting facility includes: a fluidized bed gasification furnace that generates pyrolysis gas by thermally decomposing waste and discharges incombustibles; a vertical cyclone melting furnace that includes a pyrolysis gas duct through which the pyrolysis gas is introduced; a pyrolysis gas passage that connects the fluidized bed gasification furnace with the pyrolysis gas duct of the vertical cyclone melting furnace; pulverizer that pulverize the incombustibles into pulverized incombustibles so that the particle size of the incombustibles becomes fine; and airflow transporter that puts the pulverized incombustibles in the pyrolysis gas passage, and separating metal contained in the pulverized incombustibles by a difference in specific gravity while conveying the pulverized incombustibles together with airflow. The pyrolysis gas and the pulverized incombustibles are melted in the vertical cyclone melting furnace.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI HEAVY INDUSTRIES ENVIRONMENTAL & CHEMICAL ENGINEERING CO LTDYOKOHAMA-SHI KANAGAWA 220-0012

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Saito, Yoshihisa Yokohama, JP 26 140
Sato, Jun Tokyo, JP 662 10623
Shirai, Toshimasa Yokohama, JP 10 35
Terabe, Yasunori Yokohama, JP 8 22
Yoshimitsu, Norio Yokohama, JP 6 20

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 14, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 14, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00