Industrial locomotive construction

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8807047
APP PUB NO 20140013993A1
SERIAL NO

14028184

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method is disclosed for constructing a locomotive, in part, from serviceable used parts from one or more other locomotives. The principal part that is used in this new locomotive configuration is a single, used locomotive truck assembly. The various embodiments and configurations of the present invention are directed generally to a purpose-built locomotive that incorporates parts from other locomotives in a unique way. The present invention can be summarized as a method creating a simple locomotive that is well adapted to switching and spotting functions that shares commonality with other larger locomotives both in terms of components and design. Because this new piece equipment is built in part from a plentiful supply of under-valued surplus components, it will be economical to construct and maintain. The locomotive may also include a self-elevating system so that the truck assembly can be accessed or removed rapidly for maintenance or repairs.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TRACTIVE POWER CORPORATION107-998 HARBOURSIDE DRIVE NORTH VANCOUVER BC V7P 3T2

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Donnelly, Frank Wegner North Vancouver, CA 49 1686

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 19, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00