Stereoscopic spectacles control device, display device, and stereoscopic spectacles control method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9456206
SERIAL NO

14032576

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A phase error detection unit measures a phase error between an external synchronization signal and a spectacles control signal that is fed back, more specifically, a discrepancy between vertical synchronization timing and shutter opening/closing timing, that is, jitter. A timing correction unit corrects the shutter opening/closing timing, using the measured jitter. Specifically, a parameter indicating the corrected shutter opening/closing timing is written to a storage unit. The storage unit stores a parameter used to generate the spectacles control signal, for example, the parameter indicating the shutter opening/closing timing. A signal generation unit generates the spectacles control signal, using the parameter stored in the storage unit. A frequency divider divides the frequency of the spectacles control signal by n.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SEIKO EPSON CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mizushiro, Kenji Matsumoto, JP 7 61

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 27, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 27, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00