Method for continuously producing optical display panel, and system for continuously producing optical display panel

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9575343
APP PUB NO 20140090779A1
SERIAL NO

14117796

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method includes a first bonding step including providing a first polarizing film obtained by transversely cutting a first long polarizing film having an absorption axis in its longitudinal direction, supplying the first polarizing film from a first optical film roll, and bonding the first polarizing film to a back side of the optical cell while feeding the optical cell; and a second bonding step including providing a linearly polarized light separating film obtained by transversely cutting a long linearly polarized light separating film having a reflection axis in its transverse direction, supplying the linearly polarized light separating film from a second optical film roll, and bonding the linearly polarized light separating film onto the first polarizing film bonded to the back side of the optical cell, while feeding the optical cell.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • NITTO DENKO CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hada, Kazuya Ibaraki, JP 32 150
Hirata, Satoshi Ibaraki, JP 87 548
Kondo, Seiji Ibaraki, JP 93 695

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 21, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 21, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00