Meter socket and load center combination apparatus, electrical distribution systems, and methods of assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9124077
APP PUB NO 20140099820A1
SERIAL NO

13646316

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A meter socket, load center combination apparatus is disclosed. The meter socket, load center combination apparatus has an enclosure having a meter socket section with a meter socket configured to receive a utility meter, a load center section having a panelboard with a plurality of locations configured to receive circuit interface devices, and a cross-bus connection section extending between first and second sides of the enclosure, the cross bus connection section having one or more side openings configured to allow electrical connection to one or more cross bus bars, and a main circuit breaker coupled between the panelboard and the meter socket. Methods of assembling power distribution systems and electrical distribution systems including the meter socket, load center combination apparatus are disclosed, as are other aspects.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SIEMENS INDUSTRY, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hudgins,, Jr Jeffrey Kenton Gainesville, US 6 66
Robinson, Kristopher Scott Atlanta, US 21 181
Rusch, Brian J Suwanee, US 24 164
Shumate, Arthur Kevin Duluth, US 14 95

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 1, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00