Guided vehicle system and guided vehicle control method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9836050
SERIAL NO

14124624

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a guided vehicle system, articles are transported between load ports by a plurality of guided vehicles traveling with articles carried thereon along a predetermined traveling route. A guided vehicle system controller communicates with a superordinate controller and guided vehicles, and creates traveling schedules representing positions and times at which the guided vehicles travel, disregarding interferences with other guided vehicles. For both newly created traveling schedules and traveling schedules from which interferences have been eliminated, interferences between the guided vehicles are detected, and the traveling schedules of the guided vehicles is modified so as to eliminate the detected interferences. The traveling schedules from which interferences have been eliminated interferences is stored. Also, the positions of the guided vehicles are stored based on data received from the guided vehicles, and the traveling schedules is modified.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MURATA MACHINERY, LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Yoneda, Hisato Inuyama, JP 4 16

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00