Wire harness structure and electronic device control system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9545887
APP PUB NO 20140103715A1
SERIAL NO

14140689

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a wire harness which does not increase in size with increase in number of electronic devices controlled by an electronic control unit and can standardize a relay connector, and an electronic device control system including such wire harness. A wire harness structure (2) communicably-connects electronic devices (3) mounted on a vehicle to an electronic control unit (4) controlling the electronic devices, and includes a relay connector (6, 6A, 6B) relaying a control signal from the electronic control unit to the electronic devices, a power wire (81) and a ground wire (82) drawn out from the relay connector, power supply units connected to the power wire and the ground wire, and sets of signal wires (83a, 83b, 83c) transmitting the control signal to each power supply unit arranged to supply power to the electronic device and drive the electronic device according to the control signal from the signal wire.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • YAZAKI CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aoki, Yoshihito Susono, JP 26 380
Ito, Ken Susono, JP 105 1927
Satake, Shuji Susono, JP 9 139

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 17, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 17, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00