Wafer-level RF transmission and radiation devices

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8907849
SERIAL NO

13650252

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Method for constructing a dipole radio frequency antenna includes depositing on a dielectric substrate at least one layer each of a conductive material, a dielectric material, and a sacrificial material. The deposit of conductive material is controlled to form a transmission line, antenna radiating element and associated antenna feed. The transmission line includes a shield formed of one or more walls and a center conductor disposed coaxially within the shield. An antenna feed portion is electrically connected to the center conductor and extends through a feed port on the transmission line to connect with an antenna radiating element. The radiating element has an elongated form which extends a first predetermined length transverse to an axis of the transmission line. The method also includes dissolving at least one layer of the sacrificial material to form a clearance space between the surface of the dielectric substrate and the antenna radiating element.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HARRIS CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jackson,, Jr Ronald E West Melbourne, US 2 13
Rogers, John E Vero Beach, US 88 769

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 9, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00