Multistage method for producing hydrogen-containing gaseous fuel and thermal gas-generator setup of its implementation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9249019
SERIAL NO

13709010

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a method for producing hydrocarbon-containing gaseous fuel comprises at least three stages. In the first stage water is entered for heating and water steam forming. In the second stage hydrocarbon component is entered and mixed with water steam by injecting The mixture is heated and directed to third and subsequent stages to additional heating for fuel producing. Turbo generator is made as two cylinder tubes, divided on isolated sections. The first section is made with induction heat source for system start-up, the second section is made with injector type mixer. The inner tube cavity forms the firing chamber. In technological cylinder multistage components and mixture heated and additional heating in subsequent sections are realized until forming of hydrogen-containing gaseous fuel. Burning system, worker burner, start-up burner are installed on the firing chamber inlet. Working torch forming element is installed on the firing chamber outlet.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NAUCHNO-PROEKTNOE PROIZVODSTVENNO-STROITELNOE OBEDINENIE "GRANDSTROI"GERZENA ST 102 STAVROPOL 335005

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Arakelyan, Artur Gamletovich Stavropol, RU 2 1
Arakelyan, Gamlet Gurgenovich Stavropol, RU 3 2
Arakelyan, Grant Gamletovich Stavropol, RU 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 2, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00