Methods and systems for promoting hydrogen gas distribution within cellulosic biomass solids during hydrothermal digestion

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9604189
APP PUB NO 20140174432A1
SERIAL NO

14108933

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods and systems for promoting hydrogen gas distribution within cellulosic biomass solids during hydrothermal digestion. On exemplary method can comprise: heating a first portion of cellulosic biomass solids being contacted by a continuous liquid phase and a second portion of cellulosic biomass solids being contacted by a continuous gas phase in the presence of an upwardly directed flow of molecular hydrogen and a slurry catalyst capable of activating molecular hydrogen in the continuous liquid phase; conveying at least a portion of the continuous liquid phase and at least a portion of the slurry catalyst to a location within the continuous gas phase above at least a portion of the cellulosic biomass solids; and after conveying the continuous liquid phase and the slurry catalyst, releasing them such that they contact the second portion of cellulosic biomass solids.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SHELL OIL COMPANY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Powell, Joseph Broun Houston, US 149 1399

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 28, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 28, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00