Nozzle ejection amount correcting method, functional liquid ejecting method, and organic EL device manufacturing method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9365032
APP PUB NO 20140176631A1
SERIAL NO

14097630

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A nozzle ejection amount correcting method includes: a first signal correction for performing first signal correction by calculating correction amounts of the plurality of driving signals from a difference C between a predetermined amount B in a case of ejecting liquid droplets from the selected nozzles to the ejecting regions in the main scanning performed a plurality of times and the predetermined amount A that is set in advance; a second signal correction for performing second signal correction by calculating correction amounts of the plurality of driving signals before the correction corresponding to the main scanning in the later stage from a difference E between a predetermined amount D in a case of ejecting the liquid droplets to the ejecting regions and the predetermined amount A by using the plurality of driving signals, by which the first signal correction is performed, in the main scanning in the former stage.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SEIKO EPSON CORPORATION1-6 SHINJUKU 4-CHOME SHINJUKU-KU TOKYO 160-8801

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kitabayashi, Atsushi Chino, JP 12 113

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 14, 2023
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 14, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00