Structure of headlight cowl

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9381965
APP PUB NO 20140177200A1
SERIAL NO

14067188

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A structure for a headlight cowl for reducing the difference in steering feeling between the starting of a pivotal motion and a succeeding pivotal motion when the handlebar is pivoted so that the driver is less likely to have an uncomfortable feeling. The structure of a headlight cowl includes a steering apparatus supported for pivotal motion on a head pipe at a front end of a vehicle body frame and operable to turn a front wheel in accordance with a steering operation by a driver. A headlight cowl includes left and right side faces for covering the left side and the right side of a headlight provided on a front face of an upper portion of the steering apparatus and for guiding a flow of air to flow rearwardly. The headlight cowl includes projections that individually project outwardly in a vehicle widthwise direction from the left and right side faces.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HONDA MOTOR CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tachibana, Kazuyuki Wako, JP 18 143
Tsukui, Hiroaki Wako, JP 40 454
Yoshino, Hiroki Wako, JP 37 199

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 5, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 5, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00