Methods for producing an electrically conductive material, electrically conductive material and emitter containing electrically conductive material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9269560
APP PUB NO 20140191651A1
SERIAL NO

14237211

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for manufacturing an electrically conductive material includes steps of: (a) providing a carbon fiber; (b) providing a plastic fiber that differs from the carbon fiber; (c) producing a mixture in the form of a two-dimensional mat from the carbon fiber and the plastic fiber; (d) drying the mixture, optionally; (e) consolidating the mixture; (f) cutting the mixture to size, optionally; (g) carbonizing the mixture, wherein the carbonized plastic fibers form a carbon-based matrix possessing electrical conductivity that at least partially surrounds the carbon fibers. Electrically conductive materials obtained by the method have an increased electrical resistance. An emitter is specified that contains a transparent or translucent housing and an electrically conductive material as above. These now allow emitters of virtually any length to be operated at customary line voltages.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HERAEUS NOBLELIGHT GMBH

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Klumpp, Maike Weiden, DE 3 11
Linow, Sven Darmstadt, DE 27 98

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 23, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00