Laser pulse energy control systems and methods

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9486877
APP PUB NO 20140197140A1
SERIAL NO

14151420

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and methods provide laser pulse energy control and/or monitoring. An example laser processing apparatus includes a laser system to generate a beam of laser pulses and a pulse energy control system to adjust the pulse energy of each laser pulse in the beam on a pulse-by-pulse basis. The pulse energy control system includes an open loop feedforward control path that selects a pulse energy transmission value for each laser pulse based on a calibrated transmission curve that maps laser pulse energy as a function of pulse repetition frequency. A laser energy monitor measures the laser pulse energy of each laser pulse in the beam of laser pulses. A power control loop may further adjust the pulse energy of one or more laser pulses in the beam of laser pulses based on feedback from the laser energy monitor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ELECTRO SCIENTIFIC INDUSTRIES, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Unrath, Mark A Portland, US 23 674

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 8, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 8, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00