Overlap capacitance nanowire

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8802512
APP PUB NO 20140197370A1
SERIAL NO

13739182

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A device and method for fabricating a nanowire include patterning a first set of structures on a substrate. A dummy structure is formed over portions of the substrate and the first set of structures. Exposed portions of the substrate are etched to provide an unetched raised portion. First spacers are formed about a periphery of the dummy structure and the unetched raised portion. The substrate is etched to form controlled undercut etched portions around a portion of the substrate below the dummy structure. Second spacers are formed in the controlled undercut etched portions. Source/drain regions are formed with interlayer dielectic regions formed thereon. The dummy structure is removed. The substrate is etched to release the first set of structures. Gate structures are formed including a top gate formed above the first set of structures and a bottom gate formed below the first set of structures to provide a nanowire.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Leobandung, Effendi Stormville, US 536 4756

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 12, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00