Energy-saving device for rolling plant

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9511401
APP PUB NO 20140202224A1
SERIAL NO

14240531

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A control device for a rolling plant, which is capable of reducing the pouring amount of cooling water by pouring cooling water at timing of high cooling efficiency when a material being rolled is cooled, and thereby being capable of saving the energy consumption. The control device includes a plurality of rolling stands that are arranged in tandem on a rolling line to roll the material being rolled of a metallic material conveyed on the rolling line, and inter-stand cooling systems that are provided between the plurality of rolling stands to pour cooling water onto the conveyed material being rolled. The inter-stand cooling systems are configured so that the pouring amount of cooling water poured from the inter-stand cooling system positioned on the upstream side on the rolling line is larger, and the pouring amount of cooling water poured from the inter-stand cooling system positioned on the downstream side is smaller.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TOSHIBA MITSUBISHI-ELECTRIC INDUSTRIAL SYSTEMS CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Imanari, Hiroyuki Tokyo, JP 26 119
Kubota, Kei Tokyo, JP 16 22

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 6, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 6, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00