United States of America Patent

PATENT NO 9515031
APP PUB NO 20140203417A1
SERIAL NO

13976447

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In accordance with one aspect of the present description, a transmission line such as a microstrip or stripline transmission line, has stub-shaped projections adapted to compensate simultaneously for both far-end crosstalk (FEXT) induced by inductive coupling between the transmission line and an adjacent transmission line, and also far-end crosstalk induced by inductive coupling between the vertical electrical interconnect at the far end of the transmission line and an adjacent vertical electrical interconnect electrically connected to the adjacent transmission line. In another aspect of the present description, a microstrip transmission line may have multiple stubby line sections having different resistances and impedances to more gradually transition from to the typically low impedance characteristics of vertical interconnects such as the PTH vias and socket connectors. Other aspects are described.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTEL CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Altunyurt, Nevin Chandler, US 13 154
Aygun, Kemal Chandler, US 121 654
Doran, Kevin J North Plains, US 10 31
Mekonnen, Yidnekachew S Phoenix, US 19 76

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 6, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 6, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00