Power generation system and package

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9369060
APP PUB NO 20140205072A1
SERIAL NO

13733925

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power generation system includes an input to receive a low-voltage alternating current and a number N of voltage-conversion modules coupled to the input, each electrically connected in series. Each voltage-conversion module includes a transformer configured to convert the low-voltage alternating current into a high-voltage alternating current. Each voltage-conversion module includes a multiplier configured to convert the high-voltage alternating current from the transformer into a high-voltage direct current. The multiplier includes a positive multiplier part and a negative multiplier part. The positive multiplier part and the negative multiplier part each includes a pair of input terminals connected in parallel with the transform and at least one multiplier stage comprising a single diode and a capacitor assembly. The number N is an even number between 4 and 24.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GENERAL ELECTRIC COMPANY1 RIVER ROAD SCHENECTADY NY 12345

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chu, Xu Shanghai, CN 28 84
Ernest, Philippe Gif sur Yvette, FR 25 110
Kumar, Niranjan Bangalore, IN 16 63
Mao, Saijun Shanghai, CN 21 96
Perrillat-Amede, Denis Paris, FR 23 267

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 14, 2023
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 14, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00