Plasma deposition process for producing an optical preform with a cladding glass layer of fluorine-doped quartz glass

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9487429
APP PUB NO 20140208802A1
SERIAL NO

14233104

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In plasma deposition processes for producing an optical preform according to the POD method, a cladding glass layer composed of fluorine-doped quartz glass is produced by means of a plasma torch on a cylindrical substrate body composed of quartz glass, said substrate body rotating about the longitudinal axis thereof. In this case, the plasma torch performs a reversing relative movement between two turning points (A; B) along the substrate body. In order, proceeding therefrom, to achieve a high fluorine doping in conjunction with a dopant distribution that is as uniform as possible axially, the invention proposes that a heat element has a heating effect on the region of one turning point (A; B) when the plasma torch is situated in the region of the other turning point (B; A).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HERAEUS QUARZGLAS GMBH & CO. KG

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bräuer, Karsten Bruchkoebel, DE 6 8
Schmidt, Richard Hammersbach, DE 109 1909
Schultheis, Andreas Langenselbold, DE 6 21

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 8, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 8, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00