Method for producing electronic component

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9653209
APP PUB NO 20140224418A1
SERIAL NO

14142418

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing an electronic component including a laminate, a circuit element provided therein, and external conductors electrically connected thereto. The method including steps of obtaining a mother laminate that has a plurality of the laminates arranged in a matrix-like state in a first direction and a second direction perpendicular thereto. The mother laminate is cut into the laminates. In the step of obtaining, the mother laminate is obtained such that the external conductors of two laminates adjacent in the first direction are joined, and circuit elements provided in the two laminates have a point-symmetrical relationship with each other. In the step of cutting, the mother laminate is cut along first cutoff lines extending in the second direction after the mother laminate is cut along second cutoff lines extending in the first direction. The external conductors are located on corresponding first cutoff lines.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MURATA MANUFACTURING CO LTD10-1 HIGASHIKOTARI 1-CHOME NAGAOKAKYO-SHI KYOTO 6178555 ?6178555

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Seko, Atsushi Kyoto, JP 9 102

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 16, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00