Frequency to voltage converter

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9136831
APP PUB NO 20140225650A1
SERIAL NO

14111874

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

According to the invention, there is provided a frequency to voltage converter for generating an output voltage proportional to the frequency of input signal. It comprises a switched capacitor circuit for receiving input signal and generating an input current proportional to said frequency, the switched capacitor having a capacitor charging and discharging at said frequency; an operational transconductance amplifier (OTA) for receiving at least one control voltage representative of the input current and generating current proportional to the at least one control voltage; at least one negative feedback circuit connecting input and output of the OTA, each negative feedback circuit comprising: a control transistor coupled to a node of the OTA; a diode connected transistor coupled to the control transistor for sensing current flowing through the control transistor; and a feedback transistor coupled to another node of the OTA.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INDIAN INSTITUTE OF TECHNOLOGY BOMBAY;INDIA INSTITUTE OF TECHNOLOGY BOMBAY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jayanta, Mukherjee Mumbai, IN 1 0
Maryam, Shojaei Baghini Mumbai, IN 1 0
Santosh, Kumar Gowdhaman Mumbai, IN 1 0
Vineeth, Anavangot Mumbai, IN 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 15, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00