Semiconductor integrated circuit power supply control device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9473024
APP PUB NO 20140239926A1
SERIAL NO

14272069

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A semiconductor integrated circuit device according to an embodiment includes at least one first transistor connected at its source to an input power supply line, connected at its drain to an output power supply line, and connected at its gate to a first control line, at least one second transistor connected at its source to the input power supply line, connected at its drain to the output power supply line, and connected at its gate to a second control line, a first buffer which drives the first control line, a second buffer configured to receive a control signal input via the first control line and drive the second control line, and a plurality of transfer gates provided to divide the first control line into a plurality of pieces, the plurality of transfer gates being capable of connecting pieces obtained by dividing the first control line.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TOSHIBA MEMORY CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Yamashita, Takahiro Sumida-ku, JP 137 897

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 18, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 18, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00