Steel wire for bolt, bolt, and manufacturing processes therefor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9835194
SERIAL NO

14349800

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A steel wire for high-strength bolts is used for a non heat-treatment bolt with an excellent cold forgeability for which quenching and tempering steps have been omitted after bolt formation, and which has a tensile strength of 1200 MPa or more and an excellent delayed fracture resistance. The steel wire includes C, Si, Mn, P, S, Cr, Al, N, and B, at least one selected from the group consisting of Ti, V, and Nb with the balance consisting of iron and inevitable impurities. The steel wire has a microstructure wherein ferrite and perlite have a total area rate of 98% or more, perlite lamellar spacing is 250 nm or less, and an area rate of the perlite is more than 40%, and 80% or less. The steel wire has a tensile strength of 1300 MPa or less.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KABUSHIKI KAISHA KOBE SEIKO SHO (KOBE STEEL, LTD.);KOBE STEEL, LTD.;SUGITA WIRE, LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chiba, Masamichi Kobe, JP 18 26
Matsumoto, Yousuke Kobe, JP 7 41
Sugita, Ichiro Sumida-ku, JP 1 5
Tanimoto, Masaru Sumida-ku, JP 1 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00