Collective operation management in a parallel computer

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9571329
APP PUB NO 20140258417A1
SERIAL NO

13793895

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods, apparatuses, and computer program products for collective operation management in a parallel computer are provided. Embodiments include a parallel computer having a first compute node operatively coupled for data communications over a tree data communications network with a plurality of child compute nodes. Embodiments also include each child compute node performing a first collective operation. The first compute rode, for each child compute node, receives from the child compute node, a result of the first collective operation performed by the child compute node. For each result received from a child compute node, the first compute node stores a timestamp indicating a time that the child compute node completed the first collective operation. The first compute node also manages, based on the stored timestamps, execution of a second collective operation over the tree data communications network.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Archer, Charles J Rochester, US 234 5206
Carey, James E Rochester, US 379 4917
Sanders, Philip J Rochester, US 128 2785
Smith, Brian E Knoxville, US 165 3965

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 14, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 14, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00