Hydrogen fuel dispenser with pre-cooling circuit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9586806
APP PUB NO 20140263419A1
SERIAL NO

14203702

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hydrogen fuel dispenser includes a pre-cooling circuit, a hydrogen fuel storage for storing hydrogen fuel, a nozzle for dispensing hydrogen fuel to a receptacle, and a fueling line connecting the hydrogen fuel storage to the nozzle for communicating hydrogen fuel from the hydrogen fuel storage to the nozzle. The pre-cooling circuit is provided to cool hydrogen fuel in the fueling line, and includes a pre-cooling line connected to the fueling line downstream from the hydrogen fuel storage, and a flow-path selector provided at a connection between the fueling line and the pre-cooling line. The flow-path selector selectively: blocks hydrogen fuel flow between the fueling line and the pre-cooling line while opening hydrogen fuel flow between the fueling line and a nozzle line of the nozzle; and opens hydrogen fuel flow between the fueling line and the pre-cooling line.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HONDA MOTOR CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mathison, Steve Torrance, US 10 190

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 7, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 7, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00