Semiconductor device and method of forming a dual UBM structure for lead free bump connections

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9711438
APP PUB NO 20140264850A1
SERIAL NO

14275213

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A semiconductor device has a substrate with a contact pad. A first insulation layer is formed over the substrate and contact pad. A first under bump metallization (UBM) is formed over the first insulating layer and is electrically connected to the contact pad. A second insulation layer is formed over the first UBM. A second UBM is formed over the second insulation layer after the second insulation layer is cured. The second UBM is electrically connected to the first UBM. The second insulation layer is between and separates portions of the first and second UBMs. A photoresist layer with an opening over the contact pad is formed over the second UBM. A conductive bump material is deposited within the opening in the photoresist layer. The photoresist layer is removed and the conductive bump material is reflowed to form a spherical bump.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • STATS CHIPPAC PTE. LTE.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lin, Li-Jen HsinChu, TW 5 48
Murphy, Stephen A San Jose, US 8 159
Sun, Wei Shanghai, CN 751 4791

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 18, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 18, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00