Interleaved multipath digital power amplification

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8970406
APP PUB NO 20140266820A1
SERIAL NO

14184334

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In one embodiment, a power amplification system of a radio-frequency transmitter includes a digital signal source that provides a digital input signal to an interleaved-bit-stream generator, which outputs a digital switching signal to a switching power amplifier. The interleaved-bit-stream generator has an eight-path interleaving architecture that helps reduce the effective clock-rate requirements of the interleaved-bit-stream generator. The interleaved-bit-stream generator includes an array of fractional-delay filters for receiving the digital input signal and outputting eight fractionally delayed digital output signals to a bit-stream generation array adapted to output eight corresponding bit streams to a serializer block that interleaves and combines the eight bit-streams into the digital switching signal. The relative phases of the interleaved signals may be adjusted to achieve certain desired effects.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • AVAGO TECHNOLOGIES GENERAL IP (SINGAPORE) PTE. LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Abdelli, Said E Minneapolis, US 21 59
Kiss, Peter Basking Ridge, US 25 260
Laturell, Donald R Oak Hill, US 45 583
MacDonald, James F Stillwater, US 15 42
Wilson, Ross S Menlo Park, US 46 299

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 3, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00