Techniques to reduce harmonic distortions of impedance attenuators for low-power wideband high-resolution DACs

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8872685
APP PUB NO 20140266830A1
SERIAL NO

13839763

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A digital-to-analog converter (DAC) includes, in part, a multitude of input stages that supply currents to a pair of current summing nodes in response to a digital signal, and an impedance attenuator coupled between the current summing nodes and the output of the DAC. The impedance attenuator is adapted, among other function, to increase the range of impedances of the output load, to account for changes in the output load impedance due to variations in the process, voltage and temperature, and to decouple the impedances seen by the summing nodes from the load impedance. The impedance attenuator further includes a differential-input, differential-output amplifier with programmable common-mode gain bandwidth to control the harmonic distortion of the amplifier. The impedance attenuator optionally includes a pair of cross-coupled capacitors to control the harmonic distortion of the amplifier.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • QUALCOMM INCORPORATED

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kong, Derui San Diego, US 5 10
Lee, Sang Min San Diego, US 272 1723
Seo, Dongwon San Diego, US 38 163
Song, Tongyu San Diego, US 12 32

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 28, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00