Semiconductor device and method of fabricating the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9142612
APP PUB NO 20140284618A1
SERIAL NO

14023287

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An aspect of the present embodiment, there is provided a semiconductor device, including a first electrode, a first semiconductor layer having a first conductive type connected to the first electrode, a second semiconductor layer having a second conductive type contacted to the first semiconductor layer, a third semiconductor layer having the first conductive type, an impurity concentration of the third semiconductor layer being smaller than an impurity concentration of the second semiconductor layer, the third semiconductor layer contacting to the second semiconductor layer to be separated from the first semiconductor layer by the second semiconductor layer, a gate insulator provided on the second semiconductor layer, and the first semiconductor layer and the third semiconductor layer arranged at both sides of the second semiconductor layer, respectively, a gate electrode on the gate insulator; and a second electrode connected to the third semiconductor layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KABUSHIKI KAISHA TOSHIBA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mizukami, Makoto Hyogo-ken, JP 77 1489

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 22, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00