SiC semiconductor device and method of manufacturing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9171908
APP PUB NO 20140284623A1
SERIAL NO

14205964

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A semiconductor device of an embodiment includes, an n-type SiC substrate that has first and second faces, and contains a p-type impurity and an n-type impurity, the p-type impurity being an element A, the n-type impurity being an element D, the element A and the element D being a combination of Al (aluminum), Ga (gallium), or In (indium) and N (nitrogen), and/or a combination of B (boron) and P (phosphorus), the ratio of the concentration of the element A to the concentration of the element D in the combination(s) being higher than 0.40 but lower than 0.95, the concentration of the element D forming the combination(s) being not lower than 1×1018 cm−3 and not higher than 1×1022 cm−3, an SiC layer formed on the first face, a first electrode formed on the first face side, and a second electrode formed on the second face.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KABUSHIKI KAISHA TOSHIBA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nishio, Johji Tokyo, JP 90 1266
Ota, Chiharu Kanagawa, JP 55 275
Shimizu, Tatsuo Tokyo, JP 285 2225
Shinohe, Takashi Kanagawa, JP 168 1543

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 27, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00