Near-term data filtering, smoothing and load forecasting

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9633359
APP PUB NO 20140289004A1
SERIAL NO

13931646

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Techniques for near-term data filtering, smoothing and forecasting are described herein. In one example, data is received from supervisory control and data acquisition (SCADA) measurements available in an electrical grid. The data may be filtered according to a two-stage Kalman filter, which may include a ramp rate filter test and a load level filter test. The filtered data may then be smoothed according to an augmented Savitzky-Golay filter. Within the filter, a lift multiplier may correct for bias, which may have been introduced by load changes (e.g., an early morning increase in load). In one example, the lift multiplier may be calculated as a ratio between a smoothed load from a centered Savitzky-Golay moving average and a right hand side constrained Savitzky-Golay moving average. The filtered and smoothed data may be used in forming near-term forecast(s), which may be performed by autoregressive model(s).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ITRON, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fordham, Christine Ann San Diego, US 2 34
Monforte, Frank Anthony Encinitas, US 2 34

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 25, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 25, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00