Multilayer ceramic capacitor and mounting board for multilayer ceramic capacitor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9570237
APP PUB NO 20140290998A1
SERIAL NO

13866786

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

There is provided multilayer ceramic capacitor including, a ceramic body including a plurality of dielectric layers laminated therein, an active layer including a plurality of first and second internal electrodes alternately exposed through both end surfaces of the ceramic body, with the dielectric layers interposed therebetween, and having capacitance formed therein, an upper cover layer formed on an upper portion of the active layer, a lower cover layer formed on a lower portion of the active layer and having a thickness greater than that of the upper cover layer, first and second dummy electrode terminals provided in the lower cover layer to be alternately exposed through both end surfaces of the lower cover layer, and first and second external electrodes covering the both end surfaces of the ceramic body.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SAMSUNG ELECTRO-MECHANICS CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ahn, Young Ghyu Suwon, KR 208 1513
Lee, Byoung Hwa Suwon, KR 173 1884
Park, Min Cheol Suwon, KR 176 1814
Park, Sang Soo Suwon, KR 263 2437

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 14, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 14, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00