Resonation device, method of manufacturing resonation device, electronic apparatus, and moving object

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9712137
SERIAL NO

14220783

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of manufacturing resonation device (a quartz crystal oscillator) includes the steps of applying a thermosetting thermal insulating connection material and an electrically-conductive connection material, which is higher in curing temperature than the thermosetting thermal insulating connection material, on a principal surface of a substrate, mounting fixation terminals of a resonator (a quartz crystal resonator), which has a heating element, and to which the fixation terminals and connection terminals are connected, in application positions of the insulating connection material on the substrate, and connection terminals in application positions of the electrically-conductive connection material, and heating the insulating connection material and the electrically-conductive connection material based on a reflow profile to make the insulating connection material and the electrically-conductive connection material cure in this order.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SEIKO EPSON CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kondo, Manabu Matsumoto, JP 44 251

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 18, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 18, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00