Computing system predictive build

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9218583
SERIAL NO

13853916

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Features to include within a predictive build of a computing system are selected. The predictive build is an anticipated final build of the computing system prior to receiving a firm customer order for the computing system in accordance with which an actual final build of the computing system is then built. A marginal cost of first building the predictive build and then modifying the predictive build to realize the actual final build, as compared to building the actual final build without first building the predictive build and then modifying predictive build to realize the actual final build, is estimated based on the features selected. Responsive to determining that the marginal cost is less than a predetermined acceptable marginal cost limit, the predictive build is built prior to receiving the firm customer order, and then is modified to realize the actual final build upon receiving the firm customer order.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sahawneh, Rami J Hyde Park, US 3 8
Stanquist, Gerald G Salt Point, US 14 35
Waldron, John M Highland, US 4 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 22, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00