Re-factoring, rationalizing and prioritizing a service model and assessing service exposure in the service model

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9292810
SERIAL NO

14253896

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided herein are approaches to re-factor, rationalize, and prioritize a service model, and to assess service exposure in the service model. At least one approach provides: determining a granularity of one or more services of the service model; re-factoring and refining a service portfolio and a hierarchy of the service model; adapting a Service Litmus Test (SLT) and service exposure scope to the service model; applying Service Litmus Tests (SLTs) to the service model; and verifying, with each affected stakeholder associated with the service model, that the service model achieves business and technical needs based on the results of the SLTs, which include tests to make exposure decisions, including whether to expose the service or not expose the service, wherein the service represent business capabilities and are placed in the hierarchy of the service model which represents the granularity.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Allam, Abdul Raleigh, US 29 257
Arsanjani, Ali P Fairfield, US 19 321
Ghosh, Shuvanker Tampa, US 8 43
Holley, Kerrie L Montara, US 35 501

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 22, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00