Cathode composite material synthesis having high energy density for lithium secondary battery for electric vehicle and electrode manufacturing technology thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9478993
APP PUB NO 20140306664A1
SERIAL NO

14353279

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to the manufacture of a high capacity electrode by synthesizing an excellent Li2MnO3-based composite material Li(LixNiyCozMnwO2) to improve the characteristics of an inactive Li2MnO3 material with a specific capacity of about 460 mAh/g. Here, a manufacturing method of a cathode material for a lithium secondary battery uses a Li2MnO3-based composite material Li(LixNiyCozMnwO2) by reacting a starting material wherein a nickel nitrate solution, a manganese nitrate solution and a cobalt nitrate solution are mixed, with a complex agent by co-precipitation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KOREA INSTITUTE OF INDUSTRIAL TECHNOLOGY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Boo, Seong Jae Yongin-si, KR 5 7
Chang, Duck Rye Anyang-si, KR 9 26
Kang, Ju Hee Gwangju-si, KR 13 9
Kim, Ho Sung Suwon-si, KR 55 132
Kim, Kyeong Wan Gwangju-si, KR 4 9
Kim, Tae Won Gwangju-si, KR 101 862
Oh, Ik Hyun Gwangju-si, KR 10 35
Park, Sung Hee Gwangju-si, KR 63 574

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 25, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 25, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00