R-T-B based sintered magnet

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9520216
APP PUB NO 20140311287A1
SERIAL NO

14254220

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An R-T-B based magnet as raw material undergoes heating treatment for a long time and main phase grains turn core-shell like. The R-T-B based magnet includes main phase grains having core and shell portions that covers the core. When the mass concentration of R1 and Y in the core portion is set as αR1 and αY respectively and the mass concentration of R1 and Y in the shell portion is set as βR1 and βY respectively, the ratio (B/A) between the mass concentration ratio of R1 to Y in the shell portion (βR1/βY=B) and the mass concentration ratio of R1 to Y in the core portion (αR1/αY=A) is 1.1 or more. Thus, the decrease of coercivity caused by Y addition is prevented, and the increase effect of temperature characteristics caused by addition of Y will lead to improve the magnetic properties under high temperature.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TDK CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Choi, Kyung-Ku Tokyo, JP 29 131
Enokido, Yasushi Tokyo, JP 33 253
Hashimoto, Ryuji Tokyo, JP 64 350
Tanaka, Daisuke Tokyo, JP 269 1564

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 13, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 13, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00