Blow molded toy cycle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9682739
SERIAL NO

14189749

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A blow molded toy cycle has a female bearing area with tapered and recess sections. A fork has a corresponding male bearing area that includes a tapered section and an annular protrusion section. A protrusion spaced at a distance from the annular protrusion extends from the shaft and has a surface to contact a top surface of the body to secure the fork when the male and female bearing areas are in contact. The fork has integrally formed tabs that to bend around an axle to form a bearing area for the axle that allows the axle to rotate within the fork. A blow molded pedal attaches to a section of the axle and has a series of ribs disposed between side sections to form a bearing area that allows the pedal to rotate around the axle. Two rear and one front wheels attach to the body and fork respectively.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CUSTOM-PAK, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Anderson, Jeffrey Scott Clinton, US 10 40
Franzen,, Jr Duane David Cordova, US 3 8
Grinnall, Michael Clinton, US 11 30
Knapper, Alan Walter McCausland, US 5 10
McDonnough, Andrew James Camanche, US 4 17
Naeve, Pamela Jo Clinton, US 9 34

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 20, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 20, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00