Method and assembly for operating synchronous motors

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9379651
APP PUB NO 20140312814A1
SERIAL NO

14355403

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method is disclosed for operating a synchronous machine by way of a three-phase AC power controller, which is connected to a three-phase network. The embodiment of the method includes determining the phase difference between the magnet-wheel voltage of the synchronous machine and the network voltage of the three-phase network; determining the rotational speed of the rotor of the synchronous machine; determining the phase position of the three-phase network; determining a decision characteristic number on the basis of a stored data table calculated in advance, which data table associates a decision characteristic number with value triples of phase difference, phase position, and rotational speed; and determining at least one switching time point on the basis of the decision characteristic number.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SIEMENS AKTIENGESELLSCHAFT

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Benecke, Marcel Magdeburg, DE 4 11

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 28, 2023
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 28, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00